QUANTITY SURVEYORS
Diploma in CIVIL-QS -Course Syllabus | Table of Contents
MODULE: I – BASIC –QS
- WHO ARE “ QUANTITY SURVEYORS “ or WHAT IS “QUANTITY SURVEYING” ?
- CONSTRUCTION PROJECT & ORGANIZATION STRUCTURE – POSITION OF QS.
- INTRODUCTION TO BASIC CONCEPTS OF UOM ( UNITS OF MEASUREMENTS ) & DIMENSIONS – LINEAR, AREAL &VOLUMES – RULES.
- WHAT IS A QUANITY ESTIMATE – LEVELS & LINES – PRACTICAL APPLICATIONS.
- DATA REQUIRED TO PREPARE AN ESTIMATE.
- DIFFERENCE BETWEEN DETAILED ESTIMATE & ABSTRACT COST ESTIMATE – SOLVED EXAMPLES.
- BUDGET CALCULATIONS
- TIME CALCULATIONS.
WHAT IS A CONTRACT?
DIFFERENT KINDS OF CIVIL ENGINEERING PROJECTS / STRUCTURES –
- BUILDING PROJECTS – INDIVIDUAL HOUSES, APARTMENTS, COMMERCIAL MALLS, TOWNSHIPS, ETC.,
- ROAD PROJECTS – ASPHALT & CONCRETE PAVEMENTS.
- OIL & GAS PROJECTS
- INDUSTRIAL PROJECTS
- IRRIGATION DAMS
- BRIDGES
- CULVERTSHOW TO READ THE – “ENGINEERING DRAWINGS& DETAILS “?
- PLANS
- ELEVATIONS
- SECTIONSHOW TO READ THE PTS – PROJECT TECHNICAL SPECIFICATIONS / CONTRACT SPECIFICATIONS.
METHODS OF TAKING OUT QUANTITIES
- LONG – WALL & SHORT – WALL METHOD
- Center-LINE METHOD
- PLINTH AREA METHOD
- CUBICAL CONTENTS METHODS
- SERVICE UNIT METHOD.
- QUANTITY CALCULATIONS / TAKE-OFF’S – STRUCTURAL & ARCHITECTURAL ITEMS.
- EARTHWORKS – SURVEYING – EXCAVATION/ CUTTING, FILLING & BACK-FILLING WORKS – ROADS & BUILDINGS
- ANTI-TERMITE, POLYTHENE SHEET, WATER-PROOFING MEMBRANE & SCREED CONCRETE.
- CONCRETE WORKS –FOUNDATIONS (ISOLATED, STEPPED , RAFTS, PILES, AND PILE-CAPS, ROCK-ANCHOR, ETC., ), RETAINING WALLS, DPC, COLUMNS, BEAMS, SLABS , LINTELS, WATER TANKs, SEPTIC TANK, ETC.,
- SHUTTERING & FORM WORKS
- STEEL – PREPARATION OF “BBS – BAR BENDING SCHEDULES “ & QUANTITY TAKE-OFF’S
- PLINTH BEAMS, COLUMNS, SLAB BEAMS, SLABS, ETC.
- BRICKWORK CALCULATION– ROOMS, COMPOUND WALLS, ETC.,
- FINISHING WORKS – TILES – FLOORING & CLADDING, PLASTER (IN AND OUT), STRUCTURAL GLAZING & ALUMINIUM FRAMES, PAINTING, WOODWORKS CALCULATION ETC.
- INTERIOR DECORATING WORKS
- BASIC MEP – (MECHANICAL, ELECTRICAL, AND PLUMBING) :
- WATER SUPPLY
- STORMWATER
- DRAINAGE
- FIRE-FIGHTING
- ELECTRICAL
- AIR-CONDITIONING
- HOW TO PREPARE A B.O.Q (BILL OF QUANTITIES) & B.O.M (BILL OF MATERIALS) – COMPUTER AIDED.
- WHAT IS RATE ANALYSIS & SCHEDULE OF RATES | HOW TO CALCULATE RATE – ANALYSIS FOR ALL CONSTRUCTION ACTIVITIES?
- DETAILED ESTIMATION, PREPARATION OF B.O.Q (WORKS)&B.O.M – COMPUTER AIDED.
- TYPES OF CONTRACTS –
- LUMPSUM CONTRACT
- ITEM RATE CONTRACT
- COST-PLUS CONTRACT
- EPC CONTRACT
- WHAT IS TENDERING AND HOW TENDERING PROCESS HAPPENS –
- PRE-BID PREPARATIONS
- WHAT ARE TENDER DOCUMENTS / CONTRACT DOCUMENTS.
- CALLING FOR TENDERS
- FINALIZING L1, L2 & L3 – NEGOTIATION TECHNIQUES
- AWARDING OF CONTRACT – KICK-OFF MEETING
- ROLES & RESPONSIBILITIES OF ESTIMATOR &QUANTITY SURVEYOR.
- MATERIAL PROCUREMENT – PURCHASE ORDERS & WORK ORDERS – RECEIPT AT STORES.
- WEEKLY / MONTHLY BILL PREPARATION & RETENTIONPERCENTAGE
- SUB-CONTRACTING – QUOTATIONS & INVOICE CLEARING
- WORK ORDER PREPARATION STEPS.
- WHAT IS CASH FLOW?
- WEEKLY CASH FLOW
- MONTHLY CASH FLOW
- M-BOOK & RECORDING MEASUREMENTS.
- CO-ORDINATION WITH QA/QC FOR SIGNED INSPECTION REQUESTS.
- BILL PREPARATION, HOW TO CHECK THE BILLS, BILL CERTIFICATIONS & HOW TO CLOSE A BILL
- ROLE OF QUANTITY SURVEYOR IN POST CONSTRUCTION WORKS.
- MAKE VARIATION ORDERS – RECORDING OF WORKS.
- DOCUMENTATION BACK-UPS ( SOFT COPIES & HARD COPIES )
- VALUATION OF PROPERTIES.
- FIXING OF RENTS
MODULE: II – ADVANCED –QS
- PRE – CONTRACT / TENDERING ( BEFORE CONTRACT IS AWARDED )
- POST– CONTRACT / TENDERING ( AFTER CONTRACT IS AWARDED )
Curriculum is empty