QUANTITY SURVEYORS

Diploma in CIVIL-QS -Course Syllabus | Table of Contents

MODULE: I – BASIC –QS

  1. WHO ARE “ QUANTITY SURVEYORS “ or WHAT IS “QUANTITY SURVEYING” ?
  2. CONSTRUCTION PROJECT & ORGANIZATION STRUCTURE – POSITION OF QS.
  3. INTRODUCTION TO BASIC CONCEPTS OF UOM ( UNITS OF MEASUREMENTS ) & DIMENSIONS – LINEAR, AREAL &VOLUMES – RULES.
  4. WHAT IS A QUANITY ESTIMATE – LEVELS & LINES – PRACTICAL APPLICATIONS.
  5. DATA REQUIRED TO PREPARE AN ESTIMATE.
  6. DIFFERENCE BETWEEN DETAILED ESTIMATE & ABSTRACT COST ESTIMATE – SOLVED EXAMPLES.
  7. BUDGET CALCULATIONS
  8. TIME CALCULATIONS.

    WHAT IS A CONTRACT?

    DIFFERENT KINDS OF CIVIL ENGINEERING PROJECTS / STRUCTURES –

  • BUILDING PROJECTS – INDIVIDUAL HOUSES, APARTMENTS, COMMERCIAL MALLS, TOWNSHIPS, ETC.,
  • ROAD PROJECTS – ASPHALT & CONCRETE PAVEMENTS.
  • OIL & GAS PROJECTS
  • INDUSTRIAL PROJECTS
  • IRRIGATION DAMS
  • BRIDGES
  • CULVERTSHOW TO READ THE – “ENGINEERING DRAWINGS& DETAILS “?
  • PLANS
  • ELEVATIONS
  • SECTIONSHOW TO READ THE PTS – PROJECT TECHNICAL SPECIFICATIONS / CONTRACT SPECIFICATIONS.

METHODS OF TAKING OUT QUANTITIES

  • LONG – WALL & SHORT – WALL METHOD
  • Center-LINE METHOD
  • PLINTH AREA METHOD
  • CUBICAL CONTENTS METHODS
  • SERVICE UNIT METHOD.
  1. QUANTITY CALCULATIONS / TAKE-OFF’S – STRUCTURAL & ARCHITECTURAL ITEMS.
  • EARTHWORKS – SURVEYING – EXCAVATION/ CUTTING, FILLING & BACK-FILLING WORKS – ROADS & BUILDINGS
  • ANTI-TERMITE, POLYTHENE SHEET, WATER-PROOFING MEMBRANE & SCREED CONCRETE.
  • CONCRETE WORKS –FOUNDATIONS (ISOLATED, STEPPED , RAFTS, PILES, AND PILE-CAPS, ROCK-ANCHOR, ETC., ), RETAINING WALLS, DPC, COLUMNS, BEAMS, SLABS , LINTELS, WATER TANKs, SEPTIC TANK, ETC.,
  • SHUTTERING & FORM WORKS
  • STEEL – PREPARATION OF “BBS – BAR BENDING SCHEDULES “ & QUANTITY TAKE-OFF’S
  • PLINTH BEAMS, COLUMNS, SLAB BEAMS, SLABS, ETC.
  • BRICKWORK CALCULATION– ROOMS, COMPOUND WALLS, ETC.,
  • FINISHING WORKS – TILES – FLOORING & CLADDING, PLASTER (IN AND OUT), STRUCTURAL GLAZING & ALUMINIUM FRAMES, PAINTING, WOODWORKS CALCULATION ETC.
  • INTERIOR DECORATING WORKS
  1. BASIC MEP – (MECHANICAL, ELECTRICAL, AND PLUMBING) :
  • WATER SUPPLY
  • STORMWATER
  • DRAINAGE
  • FIRE-FIGHTING
  • ELECTRICAL
  • AIR-CONDITIONING
  1. HOW TO PREPARE A B.O.Q (BILL OF QUANTITIES) & B.O.M (BILL OF MATERIALS) – COMPUTER AIDED.
  2. WHAT IS RATE ANALYSIS & SCHEDULE OF RATES | HOW TO CALCULATE RATE – ANALYSIS FOR ALL CONSTRUCTION ACTIVITIES?
  3. DETAILED ESTIMATION, PREPARATION OF B.O.Q (WORKS)&B.O.M – COMPUTER AIDED.
  4. TYPES OF CONTRACTS –
  • LUMPSUM CONTRACT
  • ITEM RATE CONTRACT
  • COST-PLUS CONTRACT
  • EPC CONTRACT
  1. WHAT IS TENDERING AND HOW TENDERING PROCESS HAPPENS –
  • PRE-BID PREPARATIONS
  • WHAT ARE TENDER DOCUMENTS / CONTRACT DOCUMENTS.
  • CALLING FOR TENDERS
  • FINALIZING L1, L2 & L3 – NEGOTIATION TECHNIQUES
  • AWARDING OF CONTRACT – KICK-OFF MEETING
  1. ROLES & RESPONSIBILITIES OF ESTIMATOR &QUANTITY SURVEYOR.
  2. MATERIAL PROCUREMENT – PURCHASE ORDERS & WORK ORDERS – RECEIPT AT STORES.
  3. WEEKLY / MONTHLY BILL PREPARATION & RETENTIONPERCENTAGE
  4. SUB-CONTRACTING – QUOTATIONS & INVOICE CLEARING
  5. WORK ORDER PREPARATION STEPS.
  6. WHAT IS CASH FLOW?
  • WEEKLY CASH FLOW
  • MONTHLY CASH FLOW
  1. M-BOOK & RECORDING MEASUREMENTS.
  2. CO-ORDINATION WITH QA/QC FOR SIGNED INSPECTION REQUESTS.
  3. BILL PREPARATION, HOW TO CHECK THE BILLS, BILL CERTIFICATIONS & HOW TO CLOSE A BILL
  4. ROLE OF QUANTITY SURVEYOR IN POST CONSTRUCTION WORKS.
  5. MAKE VARIATION ORDERS – RECORDING OF WORKS.
  6. DOCUMENTATION BACK-UPS ( SOFT COPIES & HARD COPIES )
  7. VALUATION OF PROPERTIES.
  8. FIXING OF RENTS

MODULE: II – ADVANCED –QS

  1. PRE – CONTRACT / TENDERING ( BEFORE CONTRACT IS AWARDED )
  2. POST– CONTRACT / TENDERING ( AFTER CONTRACT IS AWARDED )